INDUSTRIALISED BUILDING SYSTEM

Project 1 was a group assignment where we had to design simple apartment units using IBS construction system. The objective of this project was to conduct an analytical study of the different IBS construction methods and calculate the IBS scoring of the apartment. The final outcome was an A3 report on the precast concrete system of our apartment.

A3 Report